(1) Before painting, the surface of the base iron must be treated with Sa2.5 level, and water, dust and oil are strictly prohibited in the construction to ensure the quality of painting.
(2) The coating ratio is: Group A (base material), Group B (curing agent) =9kg paint :1kg curing agent (or according to the proportion of construction told by our factory).
(3) The construction ratio method is as follows: open group A in large sections, add Group B into Group A, and fully stir evenly. Mature for 30 minutes before painting.
(4) This material is required to be used with the matching of the paint must be used within six hours. Unfinished materials should be sealed and stored.
(5) When the relative humidity is greater than 75%, the construction should be stopped. For the parts with serious corrosive media, it is recommended to apply multiple brushes.
(6) The product should be stored in a cool and dry place to prevent direct sunlight, isolate the fire source, and stay away from the heat source.
(7) The storage period is twelve months, and the technical indicators should be tested after the expiration. If the indicators are met, they can continue to be used.